0
marigold
Uploaded by
DCI paterson
, Mar 24 2010 10:30 PM
- Owner: DCI paterson (View all images and albums)
- Uploaded: Mar 24 2010 10:30 PM
- Views: 1,776
- Category: Scotland
up on nobles slip for major work to the hull and a repaint
What's Jonah up to now? No seen him for a while.
think he is still in prison yet
What are you getting done on the slip Davie some planks or just a paint up .
boats gettin totally re-caulked from stem to stearn,from deckhead to keel.also gettin new pumps and pipe work in engine room,new platform and bulkhead in hold,recauulked from deckhead above bulkhead in engineroom right round stern and up the otherside to the same bulkhead(round frames at deck level),new oilffire anodes then a repaint.will be out of commision for 4-5 wks.
oops forgot that net drum is gettin cut and lenghthened to go back aboard.new a forgot summit lol
Well it be a new boat when you get back Davie big job your getting done it give the old girl a good few years on to her life all the best when you get back to sea .
are u not puttin a stove in her tae?
anything else getting done
whatabout a sauna to relieve the strain of the longer days
£££££££££££££££££££££££££££££ plenty where that came from ££££££££££££££££££££££